{"id":31805,"date":"2022-09-09T11:39:54","date_gmt":"2022-09-09T11:39:54","guid":{"rendered":"https:\/\/toggl.com\/blog\/?p=31805"},"modified":"2024-07-12T05:53:16","modified_gmt":"2024-07-12T05:53:16","slug":"project-profits","status":"publish","type":"post","link":"https:\/\/toggl.com\/blog\/project-profits","title":{"rendered":"Project Profitability: How To Measure &#038; Improve Margins"},"content":{"rendered":"\n<p>Profitable projects keep professional service businesses alive.<\/p>\n\n\n\n<p>Yet, measuring and increasing project profitability is a daunting task for many. The good news is that there are proven steps you can take to increase the profits of your projects, and we\u2019re going to cover them in this article.&nbsp;<\/p>\n\n\n\n<p>You\u2019ll learn:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>How to measure project profitability<\/li>\n\n\n\n<li>What project profitability analysis is<\/li>\n\n\n\n<li>How to increase project profitability in six steps&nbsp;<\/li>\n<\/ul>\n\n\n\n<p>Let\u2019s dive in.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What is project profitability?<\/strong><\/h2>\n\n\n\n<p>Project profitability is a metric that measures how much money a project makes.&nbsp;<\/p>\n\n\n\n<p>It is calculated by subtracting all project expenses, including labor, materials, and overheads, from the generated revenue. The resulting number is the profit.&nbsp;<\/p>\n\n\n\n<p>Simply put, if a project brings in more money than it costs to complete, it is profitable.&nbsp;<\/p>\n\n\n\n<p>Let\u2019s look at an example of how an agency might measure project profitability.&nbsp;<\/p>\n\n\n\n<p>The agency takes up a project for a client and agrees to a <strong>fixed fee of $10,000<\/strong>.&nbsp;<\/p>\n\n\n        <div class=\"mb-8\">\n            <span class=\"block text-dark-purple-100 opacity-60 uppercase mb-2 text-sm font-bold\">Further Reading:<\/span>\n            <div class=\"border-t-[3px] border-b border-yellow-100 py-4 pb-2 lg:grid lg:gap-8\">\n                                    <div class=\"mb-4 lg:mb-2\">\n                        <a class=\"flex items-center hover:italic hover:text-dark-purple-80\" href=\"https:\/\/toggl.com\/blog\/time-and-materials-vs-fixed-fee\" title=\"Time and Materials vs. Fixed Fee: What To Choose?\" aria-label=\"Time and Materials vs. Fixed Fee: What To Choose?\">\n                            <img decoding=\"async\" loading=\"lazy\" class=\"rounded-full w-14 h-14 mr-4 object-cover\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2023\/04\/time-materials-fixed-fees-1-112x67.jpg\" alt=\"Time and Materials vs. Fixed Fee: What To Choose?\" width=\"56\" height=\"56\">\n                            <span class=\"font-semibold font-heading leading-snug\">Time and Materials vs. Fixed Fee: What To Choose?<\/span>\n                        <\/a>\n                    <\/div>\n                            <\/div>\n        <\/div>\n    \n\n\n<p>Let\u2019s assume that this project costs $7000 to deliver. The costs include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Team salaries and benefits<\/li>\n\n\n\n<li>Cost of tools and licenses<\/li>\n\n\n\n<li>For in-office teams, rent, infrastructure, and utility costs might add up<\/li>\n\n\n\n<li>Customer acquisition costs (if considered by the agency)<\/li>\n<\/ul>\n\n\n\n<p>Project profitability = Revenue &#8211; Costs&nbsp;<\/p>\n\n\n\n<p>Thus, the profits from this project are $3,000.<\/p>\n\n\n\n<p>The above example is straightforward. Measuring project profitability precisely takes some work which we cover further down in the article.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Why is it important to track project profitability?<\/strong><\/h3>\n\n\n\n<p>Here are a few reasons why tracking project profitability matters, whether for fixed costs or time and material projects.<\/p>\n\n\n\n<p><strong>Fixed cost projects:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Budget management: <\/strong>Tracking profitability helps businesses ensure the project stays within the agreed budget and avoids overspending.&nbsp;<\/li>\n\n\n\n<li><strong>Pricing strategy<\/strong>: It helps companies evaluate their effectiveness, cover costs, and generate profit.&nbsp;<\/li>\n\n\n\n<li><strong>Financial planning<\/strong>: By having insights into the project cost structure and profitability, you can plan similar future projects effectively.&nbsp;<\/li>\n\n\n\n<li><strong>Financial health monitoring<\/strong>: Tracking project profitability helps you monitor how financially healthy your business is and ensure you can invest in future growth opportunities.&nbsp;<\/li>\n<\/ul>\n\n\n\n<p><strong>Time and material projects:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Billing accuracy: <\/strong>Tracking time and material project profitability helps bill accurately based on the actual time spent on the project. It also enables you to optimize your billable rates.<\/li>\n<\/ul>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Informed decision-making<\/strong>: With the right profitability insights, you can steer projects in the right direction and ensure they align with your financial goals.&nbsp;<\/li>\n\n\n\n<li><strong>Efficient resource allocation<\/strong>: By understanding which projects are most profitable, you can allocate resources more effectively to maximize your return on investment.&nbsp;<\/li>\n\n\n\n<li><strong>Identify project issues<\/strong>: When tracking project profitability, you can spot potential problems early on and get a project back on track if it\u2019s not meeting its profitability goals.&nbsp;<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What metrics can I use to measure project profitability?<\/strong><\/h2>\n\n\n\n<p>Below are essential profitability metrics that businesses consider when tracking project profitability.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Gross Margin&nbsp;<\/strong><\/h3>\n\n\n\n<p>Gross margin measures the difference between the revenue generated by a project and its costs. This metric helps businesses understand how much profit a project makes before considering indirect costs, like administrative expenses.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Net Profit Margin<\/strong><\/h3>\n\n\n\n<p>Net profit margin considers a project&#8217;s direct and indirect costs to show its actual profit. This metric provides a comprehensive view of a project\u2019s profitability.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Return on Investment (ROI)<\/strong><\/h3>\n\n\n\n<p>ROI calculates the ratio of net profit to the initial costs of a project. It shows how much profit each dollar of investment generates and helps businesses understand their project investments&#8217; efficiency.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Realization Rate<\/strong><\/h3>\n\n\n\n<p>This metric focuses on the billing aspect of projects. It measures the percentage of billable work hours billed to the client. The realization rate tracks how efficient billing practices are and if a business captures all potential revenue.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Utilization Rate<\/strong><\/h3>\n\n\n\n<p>Utilization rate measures the percentage of <a class=\"wpil_keyword_link\" href=\"https:\/\/toggl.com\/blog\/how-to-track-billable-hours\" target=\"_blank\" rel=\"noopener\" title=\"billable hours\" data-wpil-keyword-link=\"linked\" data-wpil-monitor-id=\"32\">billable hours<\/a> out of the total available hours.<\/p>\n\n\n\n<p>Businesses track this metric to improve productivity and increase profitability by optimizing billable hours usage.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How do you measure project profitability?<\/strong><\/h2>\n\n\n\n<p>Here\u2019s a step-by-step guide on how to efficiently measure project profitability:<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>1. Calculate your profit margins<\/strong><\/h3>\n\n\n\n<p>Profit margins are the measure of the profitability of a business. They represent the percentage of project revenue a business keeps as profit after accounting for all of its costs.<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Gross profit margin<\/strong><\/li>\n<\/ol>\n\n\n\n<p>Gross profit margin is a metric that reflects the profitability of a company\u2019s core business activities, excluding operating expenses.<\/p>\n\n\n\n<p>It shows how efficiently a company generates profit from its service delivery processes. A higher gross profit margin implies a company efficiently converts revenue into profit.&nbsp;<\/p>\n\n\n\n<p>For a fixed-price project, the gross profit margin is straightforward. You subtract project expenses from the fixed revenue amount, divide by the revenue, and multiply by 100 to get the percentage.&nbsp;<\/p>\n\n\n\n<p>In time and material projects, the revenue and project expenses are a function of the billed hours.&nbsp;<\/p>\n\n\n\n<p>Gross profit margin formula:&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"310\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-69.jpeg\" alt=\"Gross profit margin formula.\" class=\"wp-image-51511\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-69.jpeg 1280w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-69-300x73.jpeg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-69-1024x248.jpeg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-69-768x186.jpeg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-69-746x181.jpeg 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-69-1152x279.jpeg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-69-112x27.jpeg 112w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n\n\n\n<p>For example, if an agency generates $10,000 in revenue from a project and spends $4,000 on project expenses, the gross profit margin would be:&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"310\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-66.jpeg\" alt=\"Gross profit margin formula.\" class=\"wp-image-51508\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-66.jpeg 1280w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-66-300x73.jpeg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-66-1024x248.jpeg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-66-768x186.jpeg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-66-746x181.jpeg 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-66-1152x279.jpeg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-66-112x27.jpeg 112w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n\n\n\n<p>In this example, the agency\u2019s gross profit margin for the project would be 60%. This number means for every dollar of revenue earned from the project, the agency keeps $0,60 as gross profit after covering project expenses.&nbsp;<\/p>\n\n\n\n<p>Toggl Track simplifies how you calculate and visualize project profitability.&nbsp;<\/p>\n\n\n\n<p>You can add labor costs, estimates, and billable rates in Toggl Track and use the Project Dashboard and Insights reports to visualize the profitability of each project.&nbsp;<\/p>\n\n\n\n<p>To add labor costs and billable rates for team members:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Click on Organization, choose Workspace, and navigate to the Members tab.<\/li>\n\n\n\n<li>Add billable rates and labor costs in the corresponding columns by clicking on the field to edit it.&nbsp;<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1440\" height=\"788\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-250.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51532\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-250.png 1440w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-250-300x164.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-250-1024x560.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-250-768x420.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-250-738x404.png 738w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-250-1152x630.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-250-112x61.png 112w\" sizes=\"auto, (max-width: 1440px) 100vw, 1440px\" \/><\/figure>\n\n\n\n<p>Then, you can access the Insights reports for data trends and project profitability details.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"877\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-251.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51533\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-251.png 1600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-251-300x164.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-251-1024x561.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-251-768x421.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-251-1536x842.png 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-251-737x404.png 737w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-251-1152x631.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-251-1470x806.png 1470w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-251-112x61.png 112w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<ol class=\"wp-block-list\" start=\"2\">\n<li><strong>Net profit margin<\/strong><\/li>\n<\/ol>\n\n\n\n<p>Net profit margin is the percentage of revenue that remains as net profit after deducting all expenses, including project costs, operating expenses, taxes, and interest.&nbsp;<\/p>\n\n\n\n<p>It shows the overall financial health of a company and how well the company manages its expenses.&nbsp;<\/p>\n\n\n\n<p>Net profit margin is calculated by dividing net profit by revenue and multiplying by 100.&nbsp;<\/p>\n\n\n\n<p>Net profit margin formula:<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"217\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image11-1024x217.jpg\" alt=\"Net profit margin formula.\" class=\"wp-image-51536\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image11-1024x217.jpg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image11-300x64.jpg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image11-768x163.jpg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image11-746x158.jpg 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image11-1152x244.jpg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image11-112x24.jpg 112w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image11.jpg 1280w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>For example, if an agency has a net profit of $3,000 and sales revenue of $20,000, the net profit margin would be:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"310\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-67.jpeg\" alt=\"Net profit margin formula.\" class=\"wp-image-51509\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-67.jpeg 1280w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-67-300x73.jpeg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-67-1024x248.jpeg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-67-768x186.jpeg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-67-746x181.jpeg 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-67-1152x279.jpeg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-67-112x27.jpeg 112w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n\n\n\n<p>According to Investopedia, a <a href=\"https:\/\/www.investopedia.com\/articles\/personal-finance\/093015\/whats-good-profit-margin-new-business.asp\" target=\"_blank\">good profit margin for small businesses<\/a> should range from 7% to 10 %.<\/p>\n\n\n        <div class=\"mb-8\">\n            <span class=\"block text-dark-purple-100 opacity-60 uppercase mb-2 text-sm font-bold\">Further Reading:<\/span>\n            <div class=\"border-t-[3px] border-b border-yellow-100 py-4 pb-2 lg:grid lg:gap-8\">\n                                    <div class=\"mb-4 lg:mb-2\">\n                        <a class=\"flex items-center hover:italic hover:text-dark-purple-80\" href=\"https:\/\/toggl.com\/blog\/project-cost-management\" title=\"Master Project Cost Management With Our Expert Tips\" aria-label=\"Master Project Cost Management With Our Expert Tips\">\n                            <img decoding=\"async\" loading=\"lazy\" class=\"rounded-full w-14 h-14 mr-4 object-cover\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/08\/project-controls-112x67.png\" alt=\"Master Project Cost Management With Our Expert Tips\" width=\"56\" height=\"56\">\n                            <span class=\"font-semibold font-heading leading-snug\">Master Project Cost Management With Our Expert Tips<\/span>\n                        <\/a>\n                    <\/div>\n                            <\/div>\n        <\/div>\n    \n\n\n<h3 class=\"wp-block-heading\"><strong>2. Calculate the profitability index<\/strong><\/h3>\n\n\n\n<p>The profitability index is a financial tool that helps businesses evaluate the potential profitability of a project. It is a useful measure of project feasibility.<\/p>\n\n\n\n<p>It compares the money you earn from a project with the amount you invest.&nbsp;<\/p>\n\n\n\n<p>The profitability index formula divides the present value of future cash flows (the current worth of expected income discounted to reflect its value today) by the initial investment.<\/p>\n\n\n\n<p>Profitability index formula:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"310\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-68.jpeg\" alt=\"Profitability index formula.\" class=\"wp-image-51510\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-68.jpeg 1280w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-68-300x73.jpeg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-68-1024x248.jpeg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-68-768x186.jpeg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-68-746x181.jpeg 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-68-1152x279.jpeg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-68-112x27.jpeg 112w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\">\n<li>If the index is higher than 1, it\u2019s a green light. The project is likely to generate more money than its cost.<\/li>\n\n\n\n<li>If the index is less than 1, the project might not cover its initial costs, so either shelve the project or rework its budget and\/or scope.<\/li>\n\n\n\n<li>An index of exactly 1 suggests that the project will break even, which is not a profitable scenario.&nbsp;<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>3. Calculate project ROI<\/strong><\/h3>\n\n\n\n<p>According to Investopedia, ROI (return on investment) is a key financial metric that <a href=\"https:\/\/www.investopedia.com\/terms\/r\/returnoninvestment.asp\" target=\"_blank\">evaluates the profitability of an investment<\/a>.<\/p>\n\n\n\n<p>Project ROI measures how much money a business makes from a project compared to its costs.&nbsp;<\/p>\n\n\n\n<p>ROI formula:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"310\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-71.jpeg\" alt=\"ROI formula.\" class=\"wp-image-51514\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-71.jpeg 1280w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-71-300x73.jpeg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-71-1024x248.jpeg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-71-768x186.jpeg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-71-746x181.jpeg 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-71-1152x279.jpeg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-71-112x27.jpeg 112w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n\n\n\n<p>For example, let\u2019s say you invest $1,000 in a project, and it generates $1,200 in revenue. The net profit from this project would be $200 ($1,200 &#8211; $1,000).<\/p>\n\n\n\n<p>Using the ROI formula:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"310\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-65.jpeg\" alt=\"\" class=\"wp-image-51506\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-65.jpeg 1280w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-65-300x73.jpeg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-65-1024x248.jpeg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-65-768x186.jpeg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-65-746x181.jpeg 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-65-1152x279.jpeg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-65-112x27.jpeg 112w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n\n\n\n<p>Although every business has strategic and financial goals, a range between <a href=\"https:\/\/www.isixsigma.com\/dictionary\/project-return-on-investment-roi\/\" target=\"_blank\">5% and 10%<\/a> is typically considered a reasonable target ROI.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What is project profitability analysis?<\/strong><\/h2>\n\n\n\n<p>Project profitability analysis is a financial assessment technique that helps companies evaluate the financial performance and potential profit of a project.<\/p>\n\n\n\n<p>This method involves calculating the net profit or loss, considering all possible revenues, expenses, and cash flows associated with the project.&nbsp;<\/p>\n\n\n\n<p>A project profitability analysis usually considers the following factors:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Revenue projections<\/li>\n\n\n\n<li>Cost estimates<\/li>\n\n\n\n<li>Cash flow analysis<\/li>\n\n\n\n<li>Risk assessment<\/li>\n\n\n\n<li>Scenario analysis<\/li>\n\n\n\n<li>Time management<\/li>\n<\/ul>\n\n\n\n<p>In Toggl Track, you can analyze project profitability using the Insights reports and the Project Dashboard.<\/p>\n\n\n\n<p>By accessing Insights, you get precise data on project earnings, labor costs, billable hours, and income vs expenses.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"879\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51530\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249.png 1600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-300x165.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-1024x563.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-768x422.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-1536x844.png 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-735x404.png 735w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-1152x633.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-1467x806.png 1467w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-112x62.png 112w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<p>In the Project Dashboard view, you can analyze performance and see project forecasts based on total hours tracked and estimated.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"630\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-247.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51527\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-247.png 1600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-247-300x118.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-247-1024x403.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-247-768x302.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-247-1536x605.png 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-247-746x294.png 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-247-1152x454.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-247-1500x591.png 1500w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-247-112x44.png 112w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How do you increase project profitability?<\/strong><\/h2>\n\n\n\n<p>Here\u2019s a quick overview of six ways you can increase project profitability:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"831\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-77.jpeg\" alt=\"Graph showing how to increase project profitability.\" class=\"wp-image-51522\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-77.jpeg 1280w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-77-300x195.jpeg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-77-1024x665.jpeg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-77-768x499.jpeg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-77-622x404.jpeg 622w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-77-1152x748.jpeg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-77-1241x806.jpeg 1241w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-77-112x73.jpeg 112w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n\n\n\n<p>Let\u2019s look at each in detail.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>1. Track billable vs non-billable hours<\/strong><\/h3>\n\n\n\n<p>The difference between billable and non-billable hours is related to direct revenue generation.&nbsp;<\/p>\n\n\n\n<p>Billable hours are what your team spends working on client tasks and projects. You put these hours on your invoices and charge the client for them.&nbsp;<\/p>\n\n\n\n<p>Non-billable hours are what your team spends on admin tasks, internal meetings, or training. They don\u2019t generate direct income but are a cost to your business.&nbsp;<\/p>\n\n\n\n<p>A standard agency goal is to spend <a href=\"https:\/\/agencymanagementinstitute.com\/podcasts\/marketing-trends\/\" target=\"_blank\">75% of the available hours on billable tasks<\/a>.&nbsp;<\/p>\n\n\n\n<p>Separating billable and non-billable hours lets businesses accurately analyze productivity and profitability. This visibility helps project managers optimize resource allocation and pricing strategies.&nbsp;<\/p>\n\n\n\n<p>With <a href=\"https:\/\/toggl.com\/\">Toggl Track<\/a>, it\u2019s easy to track billable and non-billable hours using the online timer, browser extension, desktop and mobile apps, or integrations.&nbsp;<\/p>\n\n\n\n<p>&nbsp;Here\u2019s how:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Type in what you\u2019re working on<\/li>\n\n\n\n<li>Select your client<\/li>\n\n\n\n<li>Find the task and project you\u2019re working on<\/li>\n\n\n\n<li>Start the one-click timer<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"600\" height=\"226\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-12.gif\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51534\"\/><\/figure>\n\n\n\n<p>You can mark any project or task as billable by clicking on the $ symbol at the top of the page:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"738\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-75.jpeg\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51520\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-75.jpeg 1600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-75-300x138.jpeg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-75-1024x472.jpeg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-75-768x354.jpeg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-75-1536x708.jpeg 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-75-746x344.jpeg 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-75-1152x531.jpeg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-75-1500x692.jpeg 1500w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-75-112x52.jpeg 112w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<p><a href=\"https:\/\/support.toggl.com\/en\/articles\/6176883-toggl-track-desktop-app-for-windows\" target=\"_blank\">Toggl Track\u2019s desktop app<\/a> can automatically record all apps and websites you use in the background without manual input.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"817\" height=\"449\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-70.jpeg\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51512\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-70.jpeg 817w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-70-300x165.jpeg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-70-768x422.jpeg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-70-735x404.jpeg 735w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-70-112x62.jpeg 112w\" sizes=\"auto, (max-width: 817px) 100vw, 817px\" \/><\/figure>\n\n\n\n<p>At the end of the day, you can review the time data tracked and choose what you want to include in your timeline. All data is 100% private to each user.&nbsp;<\/p>\n\n\n\n<p>With Toggl Track, you can set billable rates flexibly at five levels:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Workspace (most general)<\/li>\n\n\n\n<li>Workspace member<\/li>\n\n\n\n<li>Project<\/li>\n\n\n\n<li>Project member<\/li>\n\n\n\n<li>Task (most granular)<\/li>\n<\/ul>\n\n\n\n<p>More granular rates always override general ones, allowing for precise billing control.<\/p>\n\n\n\n<p>To set project rates in Toggl Track:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Go to Projects.<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1268\" height=\"698\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-246.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51526\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-246.png 1268w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-246-300x165.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-246-1024x564.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-246-768x423.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-246-734x404.png 734w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-246-1152x634.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-246-112x62.png 112w\" sizes=\"auto, (max-width: 1268px) 100vw, 1268px\" \/><\/figure>\n\n\n\n<ol class=\"wp-block-list\" start=\"2\">\n<li>Click on an existing project to edit it, or click \u201cCreate new project\u201d and add the billable rate from the Project Edit popup.<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"549\" height=\"843\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-72.jpeg\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51516\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-72.jpeg 549w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-72-195x300.jpeg 195w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-72-263x404.jpeg 263w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-72-495x760.jpeg 495w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-72-525x806.jpeg 525w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-72-73x112.jpeg 73w\" sizes=\"auto, (max-width: 549px) 100vw, 549px\" \/><\/figure>\n\n\n        <div class=\"mb-8\">\n            <span class=\"block text-dark-purple-100 opacity-60 uppercase mb-2 text-sm font-bold\">Further Reading:<\/span>\n            <div class=\"border-t-[3px] border-b border-yellow-100 py-4 pb-2 lg:grid lg:gap-8\">\n                                    <div class=\"mb-4 lg:mb-2\">\n                        <a class=\"flex items-center hover:italic hover:text-dark-purple-80\" href=\"https:\/\/toggl.com\/blog\/billable-vs-non-billable\" title=\"Billable vs. Non-Billable Hours: Meaning, Differences &amp; Strategies\" aria-label=\"Billable vs. Non-Billable Hours: Meaning, Differences &amp; Strategies\">\n                            <img decoding=\"async\" loading=\"lazy\" class=\"rounded-full w-14 h-14 mr-4 object-cover\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/01\/billables-vs-non-billables-112x67.jpg\" alt=\"Billable vs. Non-Billable Hours: Meaning, Differences &amp; Strategies\" width=\"56\" height=\"56\">\n                            <span class=\"font-semibold font-heading leading-snug\">Billable vs. Non-Billable Hours: Meaning, Differences &amp; Strategies<\/span>\n                        <\/a>\n                    <\/div>\n                            <\/div>\n        <\/div>\n    \n\n\n<h3 class=\"wp-block-heading\"><strong>2. Identify bottleneck tasks<\/strong><\/h3>\n\n\n\n<p>Almost every project has bottleneck tasks that disrupt workflows and slow progress.&nbsp;<\/p>\n\n\n\n<p>Waiting for client approvals and feedback or making revisions can lead to delays and inefficiencies.&nbsp;&nbsp;<\/p>\n\n\n\n<p>Here are some brief strategies to manage bottleneck tasks:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Allocate more resources to these tasks to speed up the process.<\/li>\n\n\n\n<li>Train team members to enhance their skills or hire specialists for specific bottleneck tasks.<\/li>\n\n\n\n<li>Reallocate tasks among team members.&nbsp;<\/li>\n\n\n\n<li>Constantly review and adjust workflows and processes to prevent future bottlenecks.<\/li>\n<\/ul>\n\n\n\n<p>With <a class=\"wpil_keyword_link\" href=\"https:\/\/toggl.com\/\" target=\"_blank\" rel=\"noopener\" title=\"time tracking\" data-wpil-keyword-link=\"linked\" data-wpil-monitor-id=\"30\">time tracking<\/a> tools like Toggl Track, you can spot bottleneck tasks early to keep the project running smoothly, on schedule, and within budget.&nbsp;<\/p>\n\n\n\n<p>It lets you set up hourly tasks and <a href=\"https:\/\/support.toggl.com\/en\/articles\/2220803-project-time-estimates\" target=\"_blank\">project time estimates<\/a> to easily track progress and monitor actual hours compared to the forecast.&nbsp;<\/p>\n\n\n\n<p>To set project time estimates, follow these steps:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Click Create New Project or Edit Project<\/li>\n\n\n\n<li>Scroll down to the Time Estimate section<\/li>\n\n\n\n<li>Enter your custom hourly estimate<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"367\" height=\"192\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-240.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51507\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-240.png 367w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-240-300x157.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-240-112x59.png 112w\" sizes=\"auto, (max-width: 367px) 100vw, 367px\" \/><\/figure>\n\n\n\n<p>For more granularity, you can also create task-based estimates:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Open the Project<\/li>\n\n\n\n<li>Select the Tasks tab<\/li>\n\n\n\n<li>Add or edit an estimate from the Estimate column&nbsp;<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"351\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-242.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51519\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-242.png 1600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-242-300x66.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-242-1024x225.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-242-768x168.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-242-1536x337.png 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-242-746x164.png 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-242-1152x253.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-242-1500x329.png 1500w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-242-112x25.png 112w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<p>You can quickly overview your project\u2019s progress from the Project page.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"536\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-243.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51523\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-243.png 1600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-243-300x101.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-243-1024x343.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-243-768x257.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-243-1536x515.png 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-243-746x250.png 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-243-1152x386.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-243-1500x503.png 1500w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-243-112x38.png 112w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<p>See the overall number of tracked hours per project in the status column and compare it to the estimate you set. This feature tells you if your projects are on target or exceed your estimates.&nbsp;<\/p>\n\n\n\n<p>With this info at hand, you can easily spot time-consuming tasks and take action to reduce unproductive time.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>3. Make more accurate project estimates<\/strong><\/h3>\n\n\n\n<p>Here are a few benefits of creating accurate project estimates:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Easy to track progress<\/li>\n\n\n\n<li>Increased project profitability<\/li>\n\n\n\n<li>Fewer risks<\/li>\n\n\n\n<li>Higher client satisfaction and stakeholder confidence&nbsp;<\/li>\n\n\n\n<li>Easier to allocate resources<\/li>\n<\/ul>\n\n\n\n<p>You can estimate project time by using various <a href=\"https:\/\/toggl.com\/blog\/project-estimation-techniques\">estimating techniques<\/a>.&nbsp;<\/p>\n\n\n        <div class=\"mb-8\">\n            <span class=\"block text-dark-purple-100 opacity-60 uppercase mb-2 text-sm font-bold\">Further Reading:<\/span>\n            <div class=\"border-t-[3px] border-b border-yellow-100 py-4 pb-2 lg:grid lg:gap-8 lg:grid-cols-2\">\n                                    <div class=\"mb-4 lg:mb-2\">\n                        <a class=\"flex items-center hover:italic hover:text-dark-purple-80\" href=\"https:\/\/toggl.com\/blog\/analogous-estimating\" title=\"What Is Analogous Estimating &#038; How To Use It\" aria-label=\"What Is Analogous Estimating &#038; How To Use It\">\n                            <img decoding=\"async\" loading=\"lazy\" class=\"rounded-full w-14 h-14 mr-4 object-cover\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2023\/10\/analogous-estimation-1-112x67.jpg\" alt=\"What Is Analogous Estimating &#038; How To Use It\" width=\"56\" height=\"56\">\n                            <span class=\"font-semibold font-heading leading-snug\">What Is Analogous Estimating &#038; How To Use It<\/span>\n                        <\/a>\n                    <\/div>\n                                    <div class=\"mb-4 lg:mb-2\">\n                        <a class=\"flex items-center hover:italic hover:text-dark-purple-80\" href=\"https:\/\/toggl.com\/blog\/top-down-estimating\" title=\"Top-Down Estimating: What Is It &#038; How To Use It\" aria-label=\"Top-Down Estimating: What Is It &#038; How To Use It\">\n                            <img decoding=\"async\" loading=\"lazy\" class=\"rounded-full w-14 h-14 mr-4 object-cover\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2023\/11\/top-down-estimation-112x67.jpg\" alt=\"Top-Down Estimating: What Is It &#038; How To Use It\" width=\"56\" height=\"56\">\n                            <span class=\"font-semibold font-heading leading-snug\">Top-Down Estimating: What Is It &#038; How To Use It<\/span>\n                        <\/a>\n                    <\/div>\n                                    <div class=\"mb-4 lg:mb-2\">\n                        <a class=\"flex items-center hover:italic hover:text-dark-purple-80\" href=\"https:\/\/toggl.com\/blog\/bottom-up-estimating\" title=\"Bottom-Up Estimating: What Is It &#038; How To Use It\" aria-label=\"Bottom-Up Estimating: What Is It &#038; How To Use It\">\n                            <img decoding=\"async\" loading=\"lazy\" class=\"rounded-full w-14 h-14 mr-4 object-cover\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2023\/10\/bottom-up-estimation-1-112x67.jpg\" alt=\"Bottom-Up Estimating: What Is It &#038; How To Use It\" width=\"56\" height=\"56\">\n                            <span class=\"font-semibold font-heading leading-snug\">Bottom-Up Estimating: What Is It &#038; How To Use It<\/span>\n                        <\/a>\n                    <\/div>\n                                    <div class=\"mb-4 lg:mb-2\">\n                        <a class=\"flex items-center hover:italic hover:text-dark-purple-80\" href=\"https:\/\/toggl.com\/blog\/parametric-estimating\" title=\"Parametric Estimating in Project Management (Formula &#038; Steps)\" aria-label=\"Parametric Estimating in Project Management (Formula &#038; Steps)\">\n                            <img decoding=\"async\" loading=\"lazy\" class=\"rounded-full w-14 h-14 mr-4 object-cover\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2023\/12\/parametric-estimating-112x67.jpg\" alt=\"Parametric Estimating in Project Management (Formula &#038; Steps)\" width=\"56\" height=\"56\">\n                            <span class=\"font-semibold font-heading leading-snug\">Parametric Estimating in Project Management (Formula &#038; Steps)<\/span>\n                        <\/a>\n                    <\/div>\n                            <\/div>\n        <\/div>\n    \n\n\n<p>In Toggl Track, you can review similar past projects to create accurate estimates. Here\u2019s how:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Go to Reports and select Summary Report.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"653\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-248.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51528\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-248.png 1600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-248-300x122.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-248-1024x418.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-248-768x313.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-248-1536x627.png 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-248-746x304.png 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-248-1152x470.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-248-1500x612.png 1500w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-248-112x46.png 112w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<p>In this view, you can see clear insights into the time and costs of your past projects and billable or non-billable hours.&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\" start=\"2\">\n<li>Use the Project filter to find a similar past project.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"304\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/projectfilter-1-1024x304.jpg\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51535\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/projectfilter-1-1024x304.jpg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/projectfilter-1-300x89.jpg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/projectfilter-1-768x228.jpg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/projectfilter-1-1536x456.jpg 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/projectfilter-1-746x221.jpg 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/projectfilter-1-1152x342.jpg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/projectfilter-1-1500x445.jpg 1500w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/projectfilter-1-112x33.jpg 112w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/projectfilter-1.jpg 1684w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<ul class=\"wp-block-list\" start=\"2\">\n<li>See the task breakdown.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1594\" height=\"561\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-241.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51515\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-241.png 1594w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-241-300x106.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-241-1024x360.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-241-768x270.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-241-1536x541.png 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-241-746x263.png 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-241-1152x405.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-241-1500x528.png 1500w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-241-112x39.png 112w\" sizes=\"auto, (max-width: 1594px) 100vw, 1594px\" \/><\/figure>\n\n\n\n<p>With the <a href=\"https:\/\/support.toggl.com\/en\/articles\/3167701-project-dashboard\" target=\"_blank\">Project Dashboard<\/a> feature, you can easily track project progress by comparing actual time tracked with your estimates.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"630\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-245.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51525\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-245.png 1600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-245-300x118.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-245-1024x403.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-245-768x302.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-245-1536x605.png 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-245-746x294.png 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-245-1152x454.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-245-1500x591.png 1500w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-245-112x44.png 112w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<p>From this view, you can see:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>A forecast for project completion based on the <a class=\"wpil_keyword_link\" href=\"https:\/\/toggl.com\/blog\/project-cost-estimating\" target=\"_blank\" rel=\"noopener\" title=\"project estimate\" data-wpil-keyword-link=\"linked\" data-wpil-monitor-id=\"31\">project estimate<\/a><\/li>\n\n\n\n<li>The progress against the fixed fee amount set for the project<\/li>\n\n\n\n<li>Total billable amount tracked so far for the project<\/li>\n<\/ul>\n\n\n\n<p>These easy-to-read visual insights can help you analyze your project\u2019s performance and progress, forecast timelines and budgets, and spot potential blockers.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>4. Track your project\u2019s profitability<\/strong><\/h3>\n\n\n\n<p>To improve project profitability, you need to track it first.&nbsp;<\/p>\n\n\n\n<p>Monitoring profitability can be overwhelming without a reliable tracking system, especially when juggling multiple projects and clients.&nbsp;<\/p>\n\n\n\n<p>To calculate project profitability in Toggl Track, you must calculate and add Labor Costs first.&nbsp;<\/p>\n\n\n\n<p>Start by calculating the total available work hours in a year, usually around 2,080 for full-time employees. Then, divide the employee\u2019s annual salary by this number to get the hourly rate.<\/p>\n\n\n\n<p>Hourly labor cost formula:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"310\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-73.jpeg\" alt=\"Employee labor cost per hour formula.\" class=\"wp-image-51517\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-73.jpeg 1280w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-73-300x73.jpeg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-73-1024x248.jpeg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-73-768x186.jpeg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-73-746x181.jpeg 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-73-1152x279.jpeg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-73-112x27.jpeg 112w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n\n\n\n<p>For example, an annual salary of $40,000 results in an hourly cost of about $19.&nbsp;<\/p>\n\n\n\n<p>Once you have the labor costs for each employee, you can easily track project profitability in Toggl Track.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"411\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image15-1024x411.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51537\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image15-1024x411.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image15-300x120.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image15-768x308.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image15-1536x616.png 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image15-746x299.png 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image15-1152x462.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image15-1500x602.png 1500w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image15-112x45.png 112w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image15.png 1999w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The Insights Dashboard lets you view project profitability data in the graph and the table below.&nbsp;<\/p>\n\n\n\n<p>See project earnings and losses, labor costs, and billable hours at a glance, and export your Insights report in CSV or Excel format.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1600\" height=\"879\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51529\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249.png 1600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-300x165.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-1024x563.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-768x422.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-1536x844.png 1536w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-735x404.png 735w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-1152x633.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-1467x806.png 1467w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-249-112x62.png 112w\" sizes=\"auto, (max-width: 1600px) 100vw, 1600px\" \/><\/figure>\n\n\n\n<p>This feature also helps you forecast future revenue by analyzing your team\u2019s billable hours and expenses.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>5. Track employee utilization rate<\/strong><\/h3>\n\n\n\n<p>Calculating and tracking employee utilization rates helps you understand productivity, closely related to profitability.&nbsp;<\/p>\n\n\n\n<p>The more productive employees are, the more billable work they do, which boosts your earnings.&nbsp;<\/p>\n\n\n\n<p>To calculate employee utilization rate, most agencies use this formula:<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1280\" height=\"310\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-76.jpeg\" alt=\"Employee utilization rate formula.\" class=\"wp-image-51521\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-76.jpeg 1280w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-76-300x73.jpeg 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-76-1024x248.jpeg 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-76-768x186.jpeg 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-76-746x181.jpeg 746w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-76-1152x279.jpeg 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-76-112x27.jpeg 112w\" sizes=\"auto, (max-width: 1280px) 100vw, 1280px\" \/><\/figure>\n\n\n\n<p>For example, if an employee has 160 total available hours in a month and spends 120 hours on tasks, that can be billed to clients. Using the formula:<\/p>\n\n\n\n<p>Employee Utilization Rate = 120\/160 x100 = 75%<\/p>\n\n\n\n<p>Here\u2019s how employee utilization rates can help you increase project profitability:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Optimize work allocation<\/strong>: By understanding individual and team utilization rates, you can allocate tasks efficiently and balance workloads.&nbsp;<\/li>\n<\/ul>\n\n\n\n<p>Overutilized employees may be at risk of burnout, while underutilized team members have untapped capacity. Both scenarios hurt profitability.&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Analyze productivity<\/strong>: Utilization rates can show project managers how productive the team is.&nbsp;<\/li>\n<\/ul>\n\n\n\n<p>A consistently high utilization rate might mean your team is stretched thin, and you may need to hire more people. If employee utilization rates are low, you might need to get more clients on board.&nbsp;<\/p>\n\n\n\n<p>Tracking billable time accurately with a tool like Toggl Track, makes it easy to calculate employee utilization rates.&nbsp;<\/p>\n\n\n\n<p>Time tracking with Toggl Track is available on the web, mobile, and desktop apps or via a browser extension.&nbsp;<\/p>\n\n\n\n<p>To separate billable from non-billable hours in Toggl Track, you need to:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Go to the Projects tab and click Create a New Project.<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1268\" height=\"698\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-244.png\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51524\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-244.png 1268w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-244-300x165.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-244-1024x564.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-244-768x423.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-244-734x404.png 734w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-244-1152x634.png 1152w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-244-112x62.png 112w\" sizes=\"auto, (max-width: 1268px) 100vw, 1268px\" \/><\/figure>\n\n\n\n<ol class=\"wp-block-list\" start=\"2\">\n<li>Mark your project as billable or non-billable.<\/li>\n<\/ol>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"549\" height=\"843\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-74.jpeg\" alt=\"Screenshot of Toggl Track.\" class=\"wp-image-51518\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-74.jpeg 549w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-74-195x300.jpeg 195w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-74-263x404.jpeg 263w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-74-495x760.jpeg 495w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-74-525x806.jpeg 525w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2024\/03\/image-74-73x112.jpeg 73w\" sizes=\"auto, (max-width: 549px) 100vw, 549px\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>6. Try to eliminate scope creep<\/strong><\/h3>\n\n\n\n<p>Scope creep is when a <a class=\"wpil_keyword_link\" href=\"https:\/\/toggl.com\/blog\/requirements-gathering\" target=\"_blank\" rel=\"noopener\" title=\"project\u2019s requirements\" data-wpil-keyword-link=\"linked\" data-wpil-monitor-id=\"29\">project\u2019s requirements<\/a> (goals, deliverables, tasks) expand beyond its initial boundaries. Scope creep can pull down project profitability, causing budget overruns and delays.<\/p>\n\n\n\n<p>Here are a few ways you can avoid scope creep:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Establish clear project objectives and requirements from the start<\/li>\n\n\n\n<li>Create realistic deadlines and budgets<\/li>\n\n\n\n<li>Get key stakeholders involved in the project<\/li>\n\n\n\n<li>Create a detailed project scope<\/li>\n\n\n\n<li>Monitor project progress<\/li>\n\n\n\n<li>Create a risk management plan<\/li>\n<\/ul>\n\n\n\n<p>If you want to dig deeper into what\u2019s causing scope creep and explore tips to avoid it, read <a href=\"https:\/\/toggl.com\/blog\/project-scope-creep\">What is Scope Creep? Common Causes &amp; How to Avoid Them<\/a>.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>What is the role of a project manager in the project\u2019s profitability?<\/strong><\/h2>\n\n\n\n<p>A project manager&#8217;s role in ensuring a project&#8217;s profitability is pivotal. Here\u2019s why:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Manage planning and budgets<\/strong>: Project managers are responsible for planning projects in detail and creating and managing project budgets.<\/li>\n\n\n\n<li><strong>Allocate project resources<\/strong>: They also ensure that resources like people and materials are allocated effectively throughout the project.&nbsp;<\/li>\n\n\n\n<li><strong>Monitor progress and control expenses<\/strong>: Project managers track progress, manage costs, and adjust plans to avoid budget overruns.&nbsp;<\/li>\n\n\n\n<li><strong>Communicate with the team and stakeholders<\/strong>: They keep open lines of communication with the team and stakeholders to keep everyone aware of project goals, progress, and financial status.&nbsp;&nbsp;<\/li>\n\n\n\n<li><strong>Manage time and project scope<\/strong>: Project managers keep the project within scope and organize project timelines to meet deadlines.&nbsp;<\/li>\n\n\n\n<li><strong>Identify cost-saving opportunities<\/strong>: They seek ways to reduce costs without compromising quality to keep the project within budget.&nbsp;<\/li>\n\n\n\n<li><strong>Spot additional revenue opportunities<\/strong>: Project managers also explore opportunities within the project scope to generate more revenue.&nbsp;<\/li>\n<\/ul>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Increase project profits with the right tool<\/strong><\/h2>\n\n\n\n<p>Tracking and improving project profits is much easier with the right tool.&nbsp;<\/p>\n\n\n\n<p>You can give Toggl Track a try for free to see how it can help:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Track billable and non-billable hours<\/li>\n\n\n\n<li>Monitor project performance<\/li>\n\n\n\n<li>Calculate utilization rates<\/li>\n\n\n\n<li>Improve your estimates<\/li>\n<\/ul>\n\n\n\n<p><a href=\"https:\/\/toggl.com\/track\/product-demo\/\">Schedule a free demo with Toggl Track<\/a>.&nbsp;<\/p>\n\n\n\n<p>Related articles:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><a href=\"https:\/\/toggl.com\/blog\/project-expense-tracking\">How to Track Project Expenses (And Stay Within Budget)<\/a><\/li>\n\n\n\n<li><a href=\"https:\/\/toggl.com\/blog\/project-cost-management-software\">10 Best Cost Management Software in 2024 [Detailed Overview]<\/a><a href=\"https:\/\/toggl.com\/blog\/author\/the-toggl-team\"><\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Discover strategies to boost project profitability. Learn tips to maximize project profits and improve management.<\/p>\n","protected":false},"author":601,"featured_media":36720,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[851,996],"tags":[],"class_list":["post-31805","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-time-tracking"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Project Profitability: How To Measure &amp; Improve Margins<\/title>\n<meta name=\"description\" content=\"Discover strategies to boost project profitability. Learn tips to maximize project profits and improve management.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/toggl.com\/blog\/project-profits\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project Profitability: How To Measure &amp; Improve Margins\" \/>\n<meta property=\"og:description\" content=\"Discover strategies to boost project profitability. Learn tips to maximize project profits and improve management.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/toggl.com\/blog\/project-profits\" \/>\n<meta property=\"og:site_name\" content=\"Toggl Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Toggl\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-09-09T11:39:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-07-12T05:53:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/09\/blog-project-profits.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1081\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"The Toggl Team\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@toggl\" \/>\n<meta name=\"twitter:site\" content=\"@toggl\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"The Toggl Team\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/toggl.com\/blog\/project-profits#article\",\"isPartOf\":{\"@id\":\"https:\/\/toggl.com\/blog\/project-profits\"},\"author\":{\"name\":\"The Toggl Team\",\"@id\":\"https:\/\/toggl.com\/blog\/#\/schema\/person\/8a9040caede2fbdfe014c9167138344c\"},\"headline\":\"Project Profitability: How To Measure &#038; Improve Margins\",\"datePublished\":\"2022-09-09T11:39:54+00:00\",\"dateModified\":\"2024-07-12T05:53:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/toggl.com\/blog\/project-profits\"},\"wordCount\":2976,\"publisher\":{\"@id\":\"https:\/\/toggl.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/toggl.com\/blog\/project-profits#primaryimage\"},\"thumbnailUrl\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/09\/blog-project-profits.jpg\",\"articleSection\":[\"Project Management\",\"Time Tracking\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/toggl.com\/blog\/project-profits\",\"url\":\"https:\/\/toggl.com\/blog\/project-profits\",\"name\":\"Project Profitability: How To Measure & Improve Margins\",\"isPartOf\":{\"@id\":\"https:\/\/toggl.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/toggl.com\/blog\/project-profits#primaryimage\"},\"image\":{\"@id\":\"https:\/\/toggl.com\/blog\/project-profits#primaryimage\"},\"thumbnailUrl\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/09\/blog-project-profits.jpg\",\"datePublished\":\"2022-09-09T11:39:54+00:00\",\"dateModified\":\"2024-07-12T05:53:16+00:00\",\"description\":\"Discover strategies to boost project profitability. Learn tips to maximize project profits and improve management.\",\"breadcrumb\":{\"@id\":\"https:\/\/toggl.com\/blog\/project-profits#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/toggl.com\/blog\/project-profits\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/toggl.com\/blog\/project-profits#primaryimage\",\"url\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/09\/blog-project-profits.jpg\",\"contentUrl\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/09\/blog-project-profits.jpg\",\"width\":2048,\"height\":1081,\"caption\":\"Illustration of coins arranged like a bar graph trending upwards\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/toggl.com\/blog\/project-profits#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/toggl.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project Profitability: How To Measure &#038; Improve Margins\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/toggl.com\/blog\/#website\",\"url\":\"https:\/\/toggl.com\/blog\/\",\"name\":\"Toggl Blog\",\"description\":\"Everything works much better with Toggl\",\"publisher\":{\"@id\":\"https:\/\/toggl.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/toggl.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/toggl.com\/blog\/#organization\",\"name\":\"Toggl\",\"url\":\"https:\/\/toggl.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/toggl.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/10\/toggl-logo.png\",\"contentUrl\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/10\/toggl-logo.png\",\"width\":814,\"height\":814,\"caption\":\"Toggl\"},\"image\":{\"@id\":\"https:\/\/toggl.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Toggl\/\",\"https:\/\/x.com\/toggl\",\"https:\/\/www.instagram.com\/usetoggl\/\",\"https:\/\/www.linkedin.com\/company\/toggl\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/toggl.com\/blog\/#\/schema\/person\/8a9040caede2fbdfe014c9167138344c\",\"name\":\"The Toggl Team\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/9ad5698e745feb632df97dde968b03dd475b7153e8390d89fce9fb3f61b30b64?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/9ad5698e745feb632df97dde968b03dd475b7153e8390d89fce9fb3f61b30b64?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/9ad5698e745feb632df97dde968b03dd475b7153e8390d89fce9fb3f61b30b64?s=96&d=mm&r=g\",\"caption\":\"The Toggl Team\"},\"description\":\"Work tools to elevate your productivity \u2013 apps for incredibly simple time tracking and effective project planning.\",\"url\":\"https:\/\/toggl.com\/blog\/author\/the-toggl-team\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project Profitability: How To Measure & Improve Margins","description":"Discover strategies to boost project profitability. Learn tips to maximize project profits and improve management.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/toggl.com\/blog\/project-profits","og_locale":"en_US","og_type":"article","og_title":"Project Profitability: How To Measure & Improve Margins","og_description":"Discover strategies to boost project profitability. Learn tips to maximize project profits and improve management.","og_url":"https:\/\/toggl.com\/blog\/project-profits","og_site_name":"Toggl Blog","article_publisher":"https:\/\/www.facebook.com\/Toggl\/","article_published_time":"2022-09-09T11:39:54+00:00","article_modified_time":"2024-07-12T05:53:16+00:00","og_image":[{"width":2048,"height":1081,"url":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/09\/blog-project-profits.jpg","type":"image\/jpeg"}],"author":"The Toggl Team","twitter_card":"summary_large_image","twitter_creator":"@toggl","twitter_site":"@toggl","twitter_misc":{"Written by":"The Toggl Team","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/toggl.com\/blog\/project-profits#article","isPartOf":{"@id":"https:\/\/toggl.com\/blog\/project-profits"},"author":{"name":"The Toggl Team","@id":"https:\/\/toggl.com\/blog\/#\/schema\/person\/8a9040caede2fbdfe014c9167138344c"},"headline":"Project Profitability: How To Measure &#038; Improve Margins","datePublished":"2022-09-09T11:39:54+00:00","dateModified":"2024-07-12T05:53:16+00:00","mainEntityOfPage":{"@id":"https:\/\/toggl.com\/blog\/project-profits"},"wordCount":2976,"publisher":{"@id":"https:\/\/toggl.com\/blog\/#organization"},"image":{"@id":"https:\/\/toggl.com\/blog\/project-profits#primaryimage"},"thumbnailUrl":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/09\/blog-project-profits.jpg","articleSection":["Project Management","Time Tracking"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/toggl.com\/blog\/project-profits","url":"https:\/\/toggl.com\/blog\/project-profits","name":"Project Profitability: How To Measure & Improve Margins","isPartOf":{"@id":"https:\/\/toggl.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/toggl.com\/blog\/project-profits#primaryimage"},"image":{"@id":"https:\/\/toggl.com\/blog\/project-profits#primaryimage"},"thumbnailUrl":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/09\/blog-project-profits.jpg","datePublished":"2022-09-09T11:39:54+00:00","dateModified":"2024-07-12T05:53:16+00:00","description":"Discover strategies to boost project profitability. Learn tips to maximize project profits and improve management.","breadcrumb":{"@id":"https:\/\/toggl.com\/blog\/project-profits#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/toggl.com\/blog\/project-profits"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/toggl.com\/blog\/project-profits#primaryimage","url":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/09\/blog-project-profits.jpg","contentUrl":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/09\/blog-project-profits.jpg","width":2048,"height":1081,"caption":"Illustration of coins arranged like a bar graph trending upwards"},{"@type":"BreadcrumbList","@id":"https:\/\/toggl.com\/blog\/project-profits#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/toggl.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Project Profitability: How To Measure &#038; Improve Margins"}]},{"@type":"WebSite","@id":"https:\/\/toggl.com\/blog\/#website","url":"https:\/\/toggl.com\/blog\/","name":"Toggl Blog","description":"Everything works much better with Toggl","publisher":{"@id":"https:\/\/toggl.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/toggl.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/toggl.com\/blog\/#organization","name":"Toggl","url":"https:\/\/toggl.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/toggl.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/10\/toggl-logo.png","contentUrl":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/10\/toggl-logo.png","width":814,"height":814,"caption":"Toggl"},"image":{"@id":"https:\/\/toggl.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Toggl\/","https:\/\/x.com\/toggl","https:\/\/www.instagram.com\/usetoggl\/","https:\/\/www.linkedin.com\/company\/toggl"]},{"@type":"Person","@id":"https:\/\/toggl.com\/blog\/#\/schema\/person\/8a9040caede2fbdfe014c9167138344c","name":"The Toggl Team","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9ad5698e745feb632df97dde968b03dd475b7153e8390d89fce9fb3f61b30b64?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9ad5698e745feb632df97dde968b03dd475b7153e8390d89fce9fb3f61b30b64?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9ad5698e745feb632df97dde968b03dd475b7153e8390d89fce9fb3f61b30b64?s=96&d=mm&r=g","caption":"The Toggl Team"},"description":"Work tools to elevate your productivity \u2013 apps for incredibly simple time tracking and effective project planning.","url":"https:\/\/toggl.com\/blog\/author\/the-toggl-team"}]}},"_links":{"self":[{"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/posts\/31805","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/users\/601"}],"replies":[{"embeddable":true,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/comments?post=31805"}],"version-history":[{"count":105,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/posts\/31805\/revisions"}],"predecessor-version":[{"id":53350,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/posts\/31805\/revisions\/53350"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/media\/36720"}],"wp:attachment":[{"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/media?parent=31805"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/categories?post=31805"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/tags?post=31805"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}