{"id":57367,"date":"2026-01-08T13:30:18","date_gmt":"2026-01-08T13:30:18","guid":{"rendered":"https:\/\/toggl.com\/blog\/?p=57367"},"modified":"2026-02-17T15:50:37","modified_gmt":"2026-02-17T15:50:37","slug":"capacity-planning-vs-resource-planning","status":"publish","type":"post","link":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning","title":{"rendered":"Capacity Planning vs. Resource Planning: Why You Actually Need Both\u00a0"},"content":{"rendered":"\n<p>Should we take on this new client? Can we squeeze another project in before the end of the year? If we say yes, do we have enough people and budget left actually to tackle everything?&nbsp;<\/p>\n\n\n\n<p>These are just some of the questions we all face when planning our business workloads. And honestly, they\u2019re getting pretty old. Because running around in confusion, trying to guess what we\u2019re capable of, while being limited by our time, budget, and personnel, is exhausting.&nbsp;<\/p>\n\n\n\n<p>Poor planning is usually to blame. Even the best, most creative ideas that should be a profitability <em>slam dunk<\/em> are doomed when you don\u2019t have all your ducks in a row.&nbsp;<\/p>\n\n\n\n<p><strong><a href=\"https:\/\/toggl.com\/blog\/capacity-planning-guide\">Capacity planning<\/a> and resource planning are both key to making confident, data-driven decisions about your team\u2019s workload.<\/strong> But they tackle different questions. Confuse one for the other, and you risk missing half the picture.<\/p>\n\n\n\n<p>In this guide, we\u2019ll break down exactly what each planning term means, when to use them, and how they work together in practice. We\u2019ll also show you how <a href=\"https:\/\/toggl.com\/focus\/\">Toggl Focus<\/a>, with its built-in time tracking and visual planning tools, empowers you to strategize and deliver work that fits your team\u2019s <em>real<\/em> capacity.\u00a0<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Capacity planning vs. resource planning: What\u2019s the difference?&nbsp;<\/h2>\n\n\n\n<p>Effective capacity planning sets the limits of what\u2019s possible, while resource planning figures out how to make the most of what you\u2019ve got. Put simply, capacity planning and resource planning are close cousins in the world of <a href=\"https:\/\/toggl.com\/focus\/project-planning\/\">project planning<\/a> \u2014 definitely related, but each with its own agenda.<\/p>\n\n\n\n<p>Imagine you\u2019re planning a party. Capacity planning gives you the bigger picture of what\u2019s feasible by answering questions like:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>How many guests can we fit in the venue?<\/li>\n\n\n\n<li>How many chairs, pizzas, and playlists do we need?<\/li>\n\n\n\n<li>Will it be carnage if we try to host 100 people?<\/li>\n<\/ul>\n\n\n\n<p>Resource planning gets you into the tactical details, so you can decide things like:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Who\u2019s on DJ duty?<\/li>\n\n\n\n<li>Who\u2019s running the snack table?<\/li>\n\n\n\n<li>Who\u2019s making sure the lights don\u2019t explode?<\/li>\n<\/ul>\n\n\n\n<p>But business isn\u2019t just about parties. So, before we dive into what each planning methodology looks like in the working world, here\u2019s a quick table to give you the gist upfront.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><\/td><td><strong>Capacity planning<\/strong><\/td><td><strong>Resource planning<\/strong><\/td><\/tr><tr><td>Definition&nbsp;<\/td><td>Determines the total workload your team can handle within a specific timeframe based on available people, tools, and hours.<\/td><td>Allocates specific people and skills to tasks and projects to deliver the work efficiently.<\/td><\/tr><tr><td>Core question&nbsp;<\/td><td>\u201cHow much work can we take on?\u201d<\/td><td>\u201cWho\u2019s doing what, and when?\u201d<\/td><\/tr><tr><td>Primary focus<\/td><td>Forecasting <strong><em>future demand<\/em><\/strong><strong><em> vs. available capacity<\/em><\/strong> to avoid overcommitment.<\/td><td><strong><em>Scheduling and <\/em><\/strong><strong><em>optimizing<\/em><\/strong><strong><em> <\/em><\/strong><strong>the <\/strong><strong>right <\/strong><strong><em>resources<\/em><\/strong> (people, time, tools) to execute current work smoothly.<\/td><\/tr><tr><td>Time horizon&nbsp;<\/td><td>Long-term (weeks, months, or quarters ahead).<\/td><td>Short-term (days or weeks ahead).<\/td><\/tr><tr><td>Key inputs&nbsp;<\/td><td>Headcount, working hours, utilization targets, time-off data, project pipeline, historic data as evidence of your workload.<\/td><td>Skill sets, task durations, individual availability, project timelines, priorities.<\/td><\/tr><tr><td>Output and deliverables<\/td><td>Forecast reports, hiring or resourcing plans, \u201cwhat-if\u201d demand scenarios.<\/td><td>Detailed schedules, <a href=\"https:\/\/toggl.com\/focus\/task-management\/\">task assignments<\/a>, workload charts, project dashboards.<\/td><\/tr><tr><td>Tools and data<\/td><td><a href=\"https:\/\/toggl.com\/blog\/capacity-planning-software\">Capacity planning tools<\/a>, templates, dashboards, time-tracking trends, and forecasting functionality\u00a0<\/td><td>Project management software, or scheduling tools with live workload views<\/td><\/tr><tr><td>Typical use case<\/td><td><em>\u201cCan our design team handle three more clients next quarter?\u201d<\/em><\/td><td><em>\u201cWho should design this client\u2019s new landing page next week?\u201d<\/em><\/td><\/tr><tr><td>Ownership&nbsp;<\/td><td>Operations or senior project managers (strategic leadership level).<\/td><td>Project managers or team leads (tactical execution level).<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">What is capacity planning?&nbsp;<\/h2>\n\n\n\n<p>Capacity planning in<a href=\"https:\/\/toggl.com\/focus\/project-management-software\/\"> project management<\/a> estimates your ability to meet future demand. It\u2019s strategic and long-term in its approach, relying heavily on the availability of your current resources and on historical evidence to forecast whether you can realistically handle upcoming projects.&nbsp;<\/p>\n\n\n\n<p>Or as agency operations expert <a href=\"https:\/\/www.linkedin.com\/in\/kyle-a-hunt\/\" target=\"_blank\">Kyle Hunt<\/a> puts it, <em>\u201cCapacity, I define as how many clients can this person take on with excellence and still perform at a high quality.\u201d&nbsp;<\/em><\/p>\n\n\n\n<p>When you start tracking your team\u2019s capacity, a few magical things start to happen:&nbsp;<\/p>\n\n\n\n<p>\ud83e\udde9 <strong>You stop guessing and start balancing<\/strong>. No more heroic all-nighters or random lulls, just a healthy rhythm of work.<\/p>\n\n\n\n<p>\ud83d\udd25 <strong>You stop <\/strong><strong>burnout<\/strong><strong> dead in its tracks<\/strong>. Spot workload spikes before they turn into Slack meltdowns.<\/p>\n\n\n\n<p>\ud83d\udcca <strong>You make better business calls<\/strong>. Real data means knowing when to take on new projects and when to say <em>\u201cooooh\u2026.not yet.\u201d<\/em><\/p>\n\n\n\n<p>\ud83d\ude80 <strong>You plan with confidence<\/strong>. Capacity tracking gives you the clarity to grow sustainably.&nbsp;<\/p>\n\n\n\n<p>\ud83d\udcb8 <strong>You catch revenue leaks and price smarter<\/strong>. If your team\u2019s maxed out, you can justify raising rates or hiring instead of stretching people thin.&nbsp;<\/p>\n\n\n\n<p>On this last point, experienced agency owner Eli Rubel uses capacity planning to test price sensitivity at <a href=\"http:\/\/profit-labs.co\" target=\"_blank\">Profit Labs<\/a>.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">How to calculate capacity planning&nbsp;<\/h3>\n\n\n\n<p>If project management had a NASA mission control room, capacity planning would be the blinking dashboard at the center, tracking all the inputs that go into your project requirements and operations \u2014 think <a href=\"https:\/\/toggl.com\/track\/time-billing-software\/\">billable hours<\/a>, time off, utilization, resource demand, the list goes on \u2026&nbsp;<\/p>\n\n\n\n<p>You can use this complex data to answer the most important capacity question: <strong>Can we take this on?&nbsp;<\/strong><\/p>\n\n\n\n<p>Here\u2019s a capacity planning formula you can use to find out. It&#8217;s far simpler than it looks.&nbsp;<\/p>\n\n\n\n<p><strong>Team Capacity = (Available Hours \u00d7 Utilization Rate) \u2212 Time Off<\/strong><\/p>\n\n\n\n<p>This formula helps you translate headcount and working hours into real, usable capacity \u2014 the hours your business can actually dedicate to projects after accounting for holidays, meetings, and the occasional cat-on-keyboard moment.<\/p>\n\n\n\n<p>Let\u2019s break it down.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Step 1. Determine your total available hours<\/h4>\n\n\n\n<p>Start with the number of people and the period you\u2019re planning for (a week, month, or quarter).&nbsp;<\/p>\n\n\n\n<p><strong>Example<\/strong>: A five-person team working 40 hours a week gives you 200 total hours.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Step 2. Adjust for utilization rate<\/h4>\n\n\n\n<p>No one is productive 100% of the time. Factor in meetings, admin, and context-switching. A healthy utilization rate usually lands between 70-85% for creative and project-based teams.<\/p>\n\n\n\n<p><strong>Example<\/strong>: 200 hours x 0.8 = 160 hours of usable time<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Step 3. Subtract time off<\/h4>\n\n\n\n<p>Remove vacation, public holidays, and personal leave from the total.&nbsp;<\/p>\n\n\n\n<p><strong>Example<\/strong>: If two team members take a day off each, that\u2019s 16 hours less, leaving 144 hours of available capacity.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Step 4. Compare capacity to demand<\/h4>\n\n\n\n<p>Now, stack that capacity against your project workload.<\/p>\n\n\n\n<p><strong>Example<\/strong>: If your upcoming sprint requires 180 hours of work, but your team only has 144 hours of capacity, you\u2019re 36 hours short, meaning something\u2019s gotta give \u2026 you might reprioritize, hire, or push those timelines.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">3 capacity planning strategies you can use&nbsp;<\/h3>\n\n\n\n<p>You\u2019ve run the numbers and balanced the math. Now\u2019s the perfect time to get a handle on your capacity. Should you hire ahead of demand, wait until you\u2019re bursting at the seams, or find a happy medium?&nbsp;<\/p>\n\n\n\n<p>Here are three proven <a href=\"https:\/\/toggl.com\/blog\/capacity-planning-strategies\">capacity planning strategies<\/a> to help you choose.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Lag strategy&nbsp;<\/h4>\n\n\n\n<p><strong>Best for<\/strong>: Startups or smaller teams that want to stay lean and flexible<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1024x1024.png\" alt=\"\" class=\"wp-image-57369\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1024x1024.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-300x300.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-150x150.png 150w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-768x768.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-404x404.png 404w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-760x760.png 760w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-600x600.png 600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-806x806.png 806w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-112x112.png 112w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image.png 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>If you\u2019re looking for a safe, budget-friendly approach, why not wait until you feel the squeeze and adopt the \u201cLag?\u201d You\u2019ll only add capacity <em>after <\/em>you\u2019ve hit your limit.&nbsp;<\/p>\n\n\n\n<p>On the plus side, you won\u2019t risk wasting your resources if you commit too early. But you need to be prepared to do a little firefighting when your projects start backing up and your teams are running on caffeine and hope!&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Lead strategy&nbsp;<\/h4>\n\n\n\n<p><strong>Best for<\/strong>: Fast-growing teams or agencies that can confidently forecast new work<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-2-1024x1024.png\" alt=\"\" class=\"wp-image-57370\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-2-1024x1024.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-2-300x300.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-2-150x150.png 150w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-2-768x768.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-2-404x404.png 404w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-2-760x760.png 760w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-2-600x600.png 600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-2-806x806.png 806w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-2-112x112.png 112w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-2.png 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The \u201cLead\u201d strategy is always one step ahead of the game. With this approach, you\u2019ll add capacity as a proactive measure before you actually need it.&nbsp;<\/p>\n\n\n\n<p>Founder John Doherty describes using the Lead method to plan capacity at his content editing and writing agency, <a href=\"https:\/\/editorninja.com\/\" target=\"_blank\">Editor Ninja<\/a><em>: \u201cOnce the whole group is 75 to 80% full, we go and recruit,<\/em><\/p>\n\n\n\n<p>He begins by asking the agency\u2019s existing editors if they have any more bandwidth. \u201c<em>Often, someone will raise their hand and say \u2018I&#8217;ve got five or 10 more hours,\u2019<\/em>\u201d he says, which enables them to increase their capacity and assign them the next client.&nbsp;<\/p>\n\n\n\n<p>While this approach smooths out growing pains and positions you for quick scaling, the downside is it can force you to carry higher costs upfront while you wait for that extra work to land.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Match strategy&nbsp;<\/h4>\n\n\n\n<p><strong>Best for:<\/strong> Teams with steady workloads who want to stay efficient, agile, and data-driven&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1-1024x1024.png\" alt=\"\" class=\"wp-image-57368\" srcset=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1-1024x1024.png 1024w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1-300x300.png 300w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1-150x150.png 150w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1-768x768.png 768w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1-404x404.png 404w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1-760x760.png 760w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1-600x600.png 600w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1-806x806.png 806w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1-112x112.png 112w, https:\/\/toggl.com\/blog\/wp-content\/uploads\/2026\/01\/image-1.png 1080w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The \u201cMatch\u201d strategy is the Goldilocks of capacity management. It makes sure you\u2019re neither too early or too late \u2014 everything is <em>\u201cjuuuuust right.<\/em>\u201d But how does this work?&nbsp;<\/p>\n\n\n\n<p>Essentially, you adjust your capacity incrementally, based on real-time data, scaling up or down as your demand shifts. It\u2019s certainly the most balanced strategy, but it depends on accurate, up-to-date information, which is where <a href=\"https:\/\/toggl.com\/track\/employee-time-tracking\/\">time tracking<\/a> becomes your best friend.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">What is resource planning?&nbsp;<\/h2>\n\n\n\n<p><a href=\"https:\/\/toggl.com\/focus\/resource-planning\/\">Resource planning<\/a> is the process of making sure you have enough resources for your project or operations, and then allocating specific resources appropriately. Trust us, there are heaps to choose from.&nbsp;<\/p>\n\n\n\n<p>The obvious resources are people, time, and budget. But don\u2019t forget about other necessary resources that may be lesser-known but each play a vital role, like tools, skills, and workspace.&nbsp;<\/p>\n\n\n\n<p>Maybe it\u2019s that extra Figma license you need to renew, the shared testing environment everyone needs access to, or the one designer who knows how to use After Effects. Each of these additional resources can make or break your delivery schedule.&nbsp;<\/p>\n\n\n\n<p>Effective resource planning helps you:&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\ud83e\udded <strong>Stay on course<\/strong>. Keep every project moving by making sure the right people with the right skills are in the right place at the right time.<\/li>\n\n\n\n<li>\u2699\ufe0f <strong>Spot <\/strong><strong>bottlenecks<\/strong><strong> early<\/strong>. See where workloads or approvals are stacking up before they stall progress.<\/li>\n\n\n\n<li>\ud83d\udcc5 <strong>Maximize <\/strong><strong>resource utilization<\/strong><strong>.<\/strong> Balance workloads so your A-team isn\u2019t overloaded while others are twiddling their thumbs.<\/li>\n\n\n\n<li>\ud83e\uddd1\u200d\ud83e\udd1d\u200d\ud83e\uddd1 <strong>Use all your <\/strong><strong>available resources<\/strong><strong> wisely<\/strong>. From contractors to cloud licenses, every piece of the puzzle is tracked and accounted for.<\/li>\n\n\n\n<li>\ud83d\udcc8 <strong>Level up your <\/strong><strong>resource management<\/strong>. Be prepared with scheduling and deliver visibility into who\u2019s available, when, and for what.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\">How to calculate your resource requirements&nbsp;<\/h3>\n\n\n\n<p>Resource planning is the zoom lens that gets you up close and personal as you start matching people to projects. Yes, there\u2019s still some math involved in calculating the exact amount of resources you need. But with a few quick checks, you can see who\u2019s overbooked and if any bottlenecks are holding you back.&nbsp;<\/p>\n\n\n\n<p>Here\u2019s how to calculate your resource requirements step by step.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Step 1. Map your workload<\/h4>\n\n\n\n<p>Start with your project plan or backlog. List out every major task or deliverable, plus its estimated effort (in hours or story points).<\/p>\n\n\n\n<p>Then group tasks by role or discipline, such as designers, developers, copywriters, QA, etc. This gives you a clear view of the type of work you need to resource before you start assigning names.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Step 2. Check your available resources<\/h4>\n\n\n\n<p>Next, look at your resource availability, including who\u2019s free, for how long, and what else they\u2019re working on.<\/p>\n\n\n\n<p>Look for resource conflicts and overlaps. Someone might technically have 20 hours free, but if half of that\u2019s tied up in meetings or context-switching, their real availability is much lower.<\/p>\n\n\n\n<p>Use a live workload or resource availability chart to see if people have breathing room to spare or if they\u2019re struggling with bottlenecks.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Step 3. Allocate resources based on skills and priorities<\/h4>\n\n\n\n<p>Prioritization is the heart of resource allocation. It\u2019s the stage where you\u2019ll match the right people to the right tasks based on their unique skill sets, experience, and deadlines.<\/p>\n\n\n\n<p>Avoid the \u201cwhoever\u2019s free gets it\u201d trap. This thinking seems like it\u2019s faster short-term, but it often leads to rework or burnout later.<\/p>\n\n\n\n<p>So, when resources are scarce, assign your most critical tasks first. Often, these are the ones with client visibility or dependencies, and then work outward from there.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">Step 4. Calculate resource utilization<\/h4>\n\n\n\n<p>Next, you can look at your utilization rates \u2014 a metric that delivers balance. Use this formula:&nbsp;<\/p>\n\n\n\n<p><strong>Utilization Rate = Assigned Hours \/ Available Hours \u00d7 100<\/strong><\/p>\n\n\n\n<p><strong>Example<\/strong>: If a designer is booked for 32 hours in a 40-hour week, they\u2019re at 80% utilization, which is a healthy sweet spot. But if another team member\u2019s consistently over 95%, it\u2019s time to redistribute work.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">4 resource planning strategies&nbsp;<\/h3>\n\n\n\n<p>Once you\u2019ve mapped workloads and checked availability, the next step is organizing your resources day to day. Different teams prefer different approaches; some plan like chess grandmasters, others like jazz musicians.<\/p>\n\n\n\n<p>Here are four tried-and-true resource planning strategies:&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">1. Top-down planning&nbsp;<\/h4>\n\n\n\n<p><strong>Best for<\/strong>: Projects with fixed budgets, deadlines, or compliance requirements<\/p>\n\n\n\n<p>The top-down approach starts from your project goals and constraints \u2014 what needs to be done, by when, and with what resources. You allocate people, money, and tools according to strategic priorities. For example, this might mean locking in your budget before assigning hours, or securing software licenses before tasking the team.<\/p>\n\n\n\n<p>This method keeps spending predictable and aligns delivery with business outcomes. On the downside, it can feel a tad rigid if things change midstream.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">2. Bottom-up planning&nbsp;<\/h4>\n\n\n\n<p><strong>Best for<\/strong>: Collaborative teams that need flexibility in both effort and costs.<\/p>\n\n\n\n<p>With a bottom-up approach, teams estimate all the different types of resources they\u2019ll need, such as tools, subscriptions, workspace, support functions, and, of course\u2026 hours on the clock.&nbsp;<\/p>\n\n\n\n<p>Based on these inputs, you\u2019ll create a realistic budget and schedule you have a cat in hell\u2019s chance of sticking to. It\u2019s ideal for creative or technical projects where effort and costs can fluctuate. Beware, though, as it takes more time to align across your teams.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">3. Rolling or dynamic planning&nbsp;<\/h4>\n\n\n\n<p><strong>Best for<\/strong>: Environments with frequent scope shifts, changing budgets, or shared tools.<\/p>\n\n\n\n<p>Rolling planning is all about staying adaptable as things change. You continuously monitor your resource utilization and availability, reallocating hours, budgets, or access to shared tools as you need. The key to getting this strategy right is visibility.&nbsp;<\/p>\n\n\n\n<p>Let\u2019s say your video team finishes early, freeing up editing software licenses. A rolling plan allows you to quickly reassign those to another team.&nbsp;<\/p>\n\n\n\n<h4 class=\"wp-block-heading\">4. Scenario-based planning&nbsp;<\/h4>\n\n\n\n<p><strong>Best for<\/strong>: Teams managing multiple variables, like headcount, budgets, or client priorities.<\/p>\n\n\n\n<p>The scenario-based approach allows you to stress-test your resourcing based on \u201cwhat-if\u201d outcomes.&nbsp;<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>What if a major client expands their scope mid-project?&nbsp;<\/li>\n\n\n\n<li>What if your budget is cut by 10%?&nbsp;<\/li>\n\n\n\n<li>What if a crucial piece of software goes down?<\/li>\n<\/ul>\n\n\n\n<p>Exploring each of these scenarios allows you to mock up and run through your backup plans. For example, you might explore hiring a freelancer or shift your budget between departments. Alternatively, you could pause nonessential work altogether.&nbsp;<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Capacity planning and resource planning: Better together&nbsp;<\/h2>\n\n\n\n<p>If you\u2019ve been paying attention, you\u2019ll understand that capacity planning vs. resource planning isn\u2019t an either-or situation. You need <em>both<\/em>. While the capacity planning process looks at the big picture and resource planning zooms in on daily execution, the two work best as a continuous cycle. Focusing on one without the other limits your impact.&nbsp;<\/p>\n\n\n\n<p>Kyle Hunt is a master of partnering these two essential planning processes, knowing exactly how to maximize his agency\u2019s resources to free up more capacity. His solution is to use a pod model, where he groups together \u201c<em>highly skilled people that are working together on the same group of clients.\u201d&nbsp;<\/em><\/p>\n\n\n\n<p>As a result of the pod approach, Hunt\u2019s agency unlocks 20-30% more capacity. He doesn\u2019t need to hire more people; he just groups existing resources around shared goals. That\u2019s the compounding effect of aligning resource planning with capacity planning.&nbsp;<\/p>\n\n\n\n<p>Together, they create a self-reinforcing loop: the better you allocate and structure your resources, the more capacity you generate, and the more accurately you can plan for growth.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Capacity planning vs. resource planning: Which do you need?&nbsp;<\/h2>\n\n\n\n<p>Not sure which type of planning to start with? The answer kinda depends on the problem you\u2019re trying to solve. If you\u2019re forecasting what\u2019s possible, you need capacity planning. If you\u2019re optimizing how that work actually gets done, you need resource planning.&nbsp;<\/p>\n\n\n\n<p>Learn to tell them apart with this handy guide.&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>If your challenge sounds like this\u2026&nbsp;<\/strong><\/td><td><strong>You need \u2026<\/strong><\/td><td><strong>Because \u2026&nbsp;<\/strong><\/td><\/tr><tr><td><em>\u201cWe keep saying yes to <\/em><em>new projects<\/em><em>, then realize we don\u2019t have the people to deliver.\u201d<\/em><\/td><td>Capacity planning<\/td><td>You need to forecast demand and compare it against real, available hours before overcommitting.<\/td><\/tr><tr><td><em>\u201cOur projects stall because we don\u2019t have the right mix of skills or tools assigned.\u201d<\/em><\/td><td>Resource planning&nbsp;<\/td><td>You need to allocate the right people, tools, and budgets to the right tasks for smooth execution.<\/td><\/tr><tr><td><em>\u201cSome teams are overloaded while others have gaps in their schedules.\u201d<\/em><\/td><td>Both&nbsp;<\/td><td>You need capacity visibility <em>and <\/em>smart resource allocation to balance workloads across teams.<\/td><\/tr><tr><td><em>\u201cWe\u2019re trying to plan next quarter\u2019s <\/em><em>staffing<\/em><em> and hiring needs.\u201d<\/em><\/td><td>Capacity planning<\/td><td>You\u2019re looking at the big picture \u2014 predicting future needs and identifying where to scale.<\/td><\/tr><tr><td><em>\u201cWe\u2019re constantly juggling who\u2019s doing what each week.\u201d<\/em><\/td><td>Resource planning&nbsp;<\/td><td>You\u2019re managing day-to-day project execution and need clarity on task ownership and availability.<\/td><\/tr><tr><td><em>\u201cWe want to <\/em><em>optimize<\/em><em> performance and prevent <\/em><em>burnout<\/em><em> long-term.\u201d<\/em><\/td><td>Both&nbsp;<\/td><td>You\u2019ll get the best results by using capacity planning for forecasting and resource planning for daily balance.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 class=\"wp-block-heading\">Capacity and resource planning are a breeze in Toggl Focus&nbsp;<\/h2>\n\n\n\n<p>Every successful project plan begins and ends with time.<\/p>\n\n\n\n<p>If you don\u2019t know how much time your team truly has, you can\u2019t know your capacity. And if you don\u2019t track where that time goes, you can\u2019t manage your resource needs. Time is the thread that connects the two \u2014 the one project resource you can\u2019t stretch, pause, or get back once it\u2019s spent.<\/p>\n\n\n\n<p>That\u2019s why we\u2019ve built Toggl Focus with time at the center of your workflows. It combines accurate time tracking with real capacity and resource planning, all visualized through intuitive tools like <a href=\"https:\/\/toggl.com\/focus\/kanban-board\/\">Kanban boards<\/a>, calendars, and <a href=\"https:\/\/toggl.com\/focus\/online-gantt-chart\/\">Gantt charts<\/a>. You\u2019ll gain a true picture of what\u2019s possible, not just what\u2019s on paper.<\/p>\n\n\n\n<p>With Toggl Focus, you can:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>See your real, <\/strong><strong>current capacity<\/strong> by factoring in availability, time off, and utilization automatically.<\/li>\n\n\n\n<li><strong>Plan resources that match your reality<\/strong>, allowing you to assign work based on true hours, not placeholders.<\/li>\n\n\n\n<li><strong>Streamline<\/strong><strong> without friction<\/strong>, dragging and dropping tasks or timelines as your priorities and initiatives shift.<\/li>\n\n\n\n<li><strong>Trust your numbers<\/strong>, as every report and workload chart is powered by real tracked time.<\/li>\n<\/ul>\n\n\n\n<p>When you make time the foundation of planning, decision-making is a cinch because the rest of your project demands make sense. That\u2019s the promise of Toggl Focus: capacity and resource planning that delivers clarity you can trust. <a href=\"https:\/\/accounts.toggl.com\/focus\/signup\/\" target=\"_blank\">Start better planning for free<\/a> today.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Understand capacity planning vs resource planning \u2014 definitions, scope, use cases, and how they work together.<\/p>\n","protected":false},"author":650,"featured_media":56191,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[851,995,999],"tags":[1000,814],"class_list":["post-57367","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-management","category-resource-management","category-toggl-focus","tag-capacity-planning","tag-resource-management"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Capacity Planning vs. Resource Planning: Why You Actually Need Both\u00a0<\/title>\n<meta name=\"description\" content=\"Understand capacity planning vs resource planning \u2014 definitions, scope, use cases, and how they work together.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Capacity Planning vs. Resource Planning: Why You Actually Need Both\u00a0\" \/>\n<meta property=\"og:description\" content=\"Understand capacity planning vs resource planning \u2014 definitions, scope, use cases, and how they work together.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning\" \/>\n<meta property=\"og:site_name\" content=\"Toggl Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/Toggl\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-08T13:30:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-02-17T15:50:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2025\/01\/Organizational-development.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1800\" \/>\n\t<meta property=\"og:image:height\" content=\"1091\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Rebecca Noori\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@toggl\" \/>\n<meta name=\"twitter:site\" content=\"@toggl\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Rebecca Noori\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#article\",\"isPartOf\":{\"@id\":\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning\"},\"author\":{\"name\":\"Rebecca Noori\",\"@id\":\"https:\/\/toggl.com\/blog\/#\/schema\/person\/95aa54679d592d29fb61f7c57adb0bb4\"},\"headline\":\"Capacity Planning vs. Resource Planning: Why You Actually Need Both\u00a0\",\"datePublished\":\"2026-01-08T13:30:18+00:00\",\"dateModified\":\"2026-02-17T15:50:37+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning\"},\"wordCount\":3179,\"publisher\":{\"@id\":\"https:\/\/toggl.com\/blog\/#organization\"},\"image\":{\"@id\":\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#primaryimage\"},\"thumbnailUrl\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2025\/01\/Organizational-development.png\",\"keywords\":[\"Capacity planning\",\"Resource Management\"],\"articleSection\":[\"Project Management\",\"Resource Management\",\"Toggl Focus\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning\",\"url\":\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning\",\"name\":\"Capacity Planning vs. Resource Planning: Why You Actually Need Both\u00a0\",\"isPartOf\":{\"@id\":\"https:\/\/toggl.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#primaryimage\"},\"image\":{\"@id\":\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#primaryimage\"},\"thumbnailUrl\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2025\/01\/Organizational-development.png\",\"datePublished\":\"2026-01-08T13:30:18+00:00\",\"dateModified\":\"2026-02-17T15:50:37+00:00\",\"description\":\"Understand capacity planning vs resource planning \u2014 definitions, scope, use cases, and how they work together.\",\"breadcrumb\":{\"@id\":\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#primaryimage\",\"url\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2025\/01\/Organizational-development.png\",\"contentUrl\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2025\/01\/Organizational-development.png\",\"width\":1800,\"height\":1091,\"caption\":\"Organizational development\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/toggl.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Capacity Planning vs. Resource Planning: Why You Actually Need Both\u00a0\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/toggl.com\/blog\/#website\",\"url\":\"https:\/\/toggl.com\/blog\/\",\"name\":\"Toggl Blog\",\"description\":\"Everything works much better with Toggl\",\"publisher\":{\"@id\":\"https:\/\/toggl.com\/blog\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/toggl.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/toggl.com\/blog\/#organization\",\"name\":\"Toggl\",\"url\":\"https:\/\/toggl.com\/blog\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/toggl.com\/blog\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/10\/toggl-logo.png\",\"contentUrl\":\"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/10\/toggl-logo.png\",\"width\":814,\"height\":814,\"caption\":\"Toggl\"},\"image\":{\"@id\":\"https:\/\/toggl.com\/blog\/#\/schema\/logo\/image\/\"},\"sameAs\":[\"https:\/\/www.facebook.com\/Toggl\/\",\"https:\/\/x.com\/toggl\",\"https:\/\/www.instagram.com\/usetoggl\/\",\"https:\/\/www.linkedin.com\/company\/toggl\"]},{\"@type\":\"Person\",\"@id\":\"https:\/\/toggl.com\/blog\/#\/schema\/person\/95aa54679d592d29fb61f7c57adb0bb4\",\"name\":\"Rebecca Noori\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/secure.gravatar.com\/avatar\/65d84957f8a92f6a4046c2e44ccc90bded9df283c27410d5b1a59f0c43807bfc?s=96&d=mm&r=g\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/65d84957f8a92f6a4046c2e44ccc90bded9df283c27410d5b1a59f0c43807bfc?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/65d84957f8a92f6a4046c2e44ccc90bded9df283c27410d5b1a59f0c43807bfc?s=96&d=mm&r=g\",\"caption\":\"Rebecca Noori\"},\"description\":\"Rebecca has 10+ years' experience producing content for HR tech and work management companies. She has a talent for breaking down complex ideas into practical advice that helps businesses and professionals thrive in the modern workplace. Rebecca's content is featured in publications like Forbes, Business Insider, and Entrepreneur, and she also partners with companies like UKG, Deel, monday.com, and Nectar, covering all aspects of the employee lifecycle. As a member of the Josh Bersin Academy, she networks with people professionals and keeps her HR skills sharp with regular courses.\",\"url\":\"https:\/\/toggl.com\/blog\/author\/rebeccanoori\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Capacity Planning vs. Resource Planning: Why You Actually Need Both\u00a0","description":"Understand capacity planning vs resource planning \u2014 definitions, scope, use cases, and how they work together.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning","og_locale":"en_US","og_type":"article","og_title":"Capacity Planning vs. Resource Planning: Why You Actually Need Both\u00a0","og_description":"Understand capacity planning vs resource planning \u2014 definitions, scope, use cases, and how they work together.","og_url":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning","og_site_name":"Toggl Blog","article_publisher":"https:\/\/www.facebook.com\/Toggl\/","article_published_time":"2026-01-08T13:30:18+00:00","article_modified_time":"2026-02-17T15:50:37+00:00","og_image":[{"width":1800,"height":1091,"url":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2025\/01\/Organizational-development.png","type":"image\/png"}],"author":"Rebecca Noori","twitter_card":"summary_large_image","twitter_creator":"@toggl","twitter_site":"@toggl","twitter_misc":{"Written by":"Rebecca Noori","Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#article","isPartOf":{"@id":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning"},"author":{"name":"Rebecca Noori","@id":"https:\/\/toggl.com\/blog\/#\/schema\/person\/95aa54679d592d29fb61f7c57adb0bb4"},"headline":"Capacity Planning vs. Resource Planning: Why You Actually Need Both\u00a0","datePublished":"2026-01-08T13:30:18+00:00","dateModified":"2026-02-17T15:50:37+00:00","mainEntityOfPage":{"@id":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning"},"wordCount":3179,"publisher":{"@id":"https:\/\/toggl.com\/blog\/#organization"},"image":{"@id":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#primaryimage"},"thumbnailUrl":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2025\/01\/Organizational-development.png","keywords":["Capacity planning","Resource Management"],"articleSection":["Project Management","Resource Management","Toggl Focus"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning","url":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning","name":"Capacity Planning vs. Resource Planning: Why You Actually Need Both\u00a0","isPartOf":{"@id":"https:\/\/toggl.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#primaryimage"},"image":{"@id":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#primaryimage"},"thumbnailUrl":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2025\/01\/Organizational-development.png","datePublished":"2026-01-08T13:30:18+00:00","dateModified":"2026-02-17T15:50:37+00:00","description":"Understand capacity planning vs resource planning \u2014 definitions, scope, use cases, and how they work together.","breadcrumb":{"@id":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#primaryimage","url":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2025\/01\/Organizational-development.png","contentUrl":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2025\/01\/Organizational-development.png","width":1800,"height":1091,"caption":"Organizational development"},{"@type":"BreadcrumbList","@id":"https:\/\/toggl.com\/blog\/capacity-planning-vs-resource-planning#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/toggl.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Capacity Planning vs. Resource Planning: Why You Actually Need Both\u00a0"}]},{"@type":"WebSite","@id":"https:\/\/toggl.com\/blog\/#website","url":"https:\/\/toggl.com\/blog\/","name":"Toggl Blog","description":"Everything works much better with Toggl","publisher":{"@id":"https:\/\/toggl.com\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/toggl.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/toggl.com\/blog\/#organization","name":"Toggl","url":"https:\/\/toggl.com\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/toggl.com\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/10\/toggl-logo.png","contentUrl":"https:\/\/toggl.com\/blog\/wp-content\/uploads\/2022\/10\/toggl-logo.png","width":814,"height":814,"caption":"Toggl"},"image":{"@id":"https:\/\/toggl.com\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/Toggl\/","https:\/\/x.com\/toggl","https:\/\/www.instagram.com\/usetoggl\/","https:\/\/www.linkedin.com\/company\/toggl"]},{"@type":"Person","@id":"https:\/\/toggl.com\/blog\/#\/schema\/person\/95aa54679d592d29fb61f7c57adb0bb4","name":"Rebecca Noori","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/65d84957f8a92f6a4046c2e44ccc90bded9df283c27410d5b1a59f0c43807bfc?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/65d84957f8a92f6a4046c2e44ccc90bded9df283c27410d5b1a59f0c43807bfc?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65d84957f8a92f6a4046c2e44ccc90bded9df283c27410d5b1a59f0c43807bfc?s=96&d=mm&r=g","caption":"Rebecca Noori"},"description":"Rebecca has 10+ years' experience producing content for HR tech and work management companies. She has a talent for breaking down complex ideas into practical advice that helps businesses and professionals thrive in the modern workplace. Rebecca's content is featured in publications like Forbes, Business Insider, and Entrepreneur, and she also partners with companies like UKG, Deel, monday.com, and Nectar, covering all aspects of the employee lifecycle. As a member of the Josh Bersin Academy, she networks with people professionals and keeps her HR skills sharp with regular courses.","url":"https:\/\/toggl.com\/blog\/author\/rebeccanoori"}]}},"_links":{"self":[{"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/posts\/57367","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/users\/650"}],"replies":[{"embeddable":true,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/comments?post=57367"}],"version-history":[{"count":5,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/posts\/57367\/revisions"}],"predecessor-version":[{"id":58121,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/posts\/57367\/revisions\/58121"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/media\/56191"}],"wp:attachment":[{"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/media?parent=57367"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/categories?post=57367"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/toggl.com\/blog\/wp-json\/wp\/v2\/tags?post=57367"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}